Scenario,
The engineering team from a local articulated truck manufacturer has recently made the decision to upgrade and automate an existing paint booth that is used to a paint the rear axle bearing components, with the aim of significantly improving the process.
The senior management team from your organisation have been succesfull in winning the contract to design and install a PLC control system for the paint booth and you have been tasked with that part of the project, the process will require the use of temperature sensors and heating elements to ensure that the parts are cured at the right temperature.
The management team are also still in the process of producing a proposal for futher upgrades to the customers existing process. The management team have asked that you produce a proposal that will provide an evaulation of the potential for upgrades to a customers machine and the benefits to the organisation.
Task 1 – System Control, (LO4)
The system shown below in figures 1 and 2 is to be controlled by the PLC. The PLC will perform the following functions, if and only if the ready signal is received from the microcontroller. You are required to design and write a program for the paint booth process.
Rules of Operation
Step 1 – Upon activation of the system ready push Button, the system will be ready to use – only if the conveyor, extraction and ovens are switched off. This will be also be indicated by a the red “System ready” light. The system must have an emergency stop to shut down the full system.
Note: Emergency stop should stop the full system from working until reset.
Step 2 – When the “system ready” light is on, the extraction fans are activated using a push button located on the control panel. The extraction fans must be running constantly and must remain running for a minimum of 5 minutes after the paint booth is switched off in order to remove paint fumes.
Step 3 – After the extraction fans have been running for 5 minutes, the oven heating elements will be automatically switched on.
Step 4 – The conveyor will only start when all of the above conditions have been met, a part is detected by proxy sensor 1 and the heating elements have been on for 5 minutes. The conveyor will only stop after a 5-minute delay allowing parts to be cleared from the conveyor belt.
Step 5 – The Stop button on the control panel will turn off the full system after a 5-second cycle down delay. In order to reduce inventory, the paint booth should automatically cycle down once a pre-determined number off parts have been completed.
Step 6 – All outputs must have a corresponding indicator light on the control panel that is used to inform the operator what is running.
Step 7 – All parts must be counted in and out of the paint booth.
PLC Design Notes (20 Marks)
Your company has been asked to submit a comprehensive a set of design notes for the PLC program based on the required functionality described above. This is part of the tender process and will help the engineering team at the articulated truck company make the decision on which OEM to award the contract to. This should include:
• Any presumptions you have had to make
• Flowchart or Sequential Function Chart
• I/O list
• Variable list
• System Block diagrams and Electrical connection diagrams
PLC Program (10 Marks)
Your company has been awarded the contract to build the system. You will create your PLC program which should correlate to your design notes.
You must work individually, export your CCW program as a Word document and add it to the report. You can make reference to the to the following documentation which is available through the CCW software and on Rockwell Automation website (details in the lab guides):
• CCW programming manual
• Micro820 hardware manual
• CCW quick start guide
The report will be submitted through Turnitin and will be scrutinised for any signs of plagiarism or collusion.
Task 2 – Operators Manual and Further Documentation (20 marks)
As part of the tender process you must provide a Powerpoint presentation (no more than 3 slides) suitable for training the articulated truck company employees. They have no experience working with PLC controlled automated systems. The training manual should cover the architecture of the a should provide an overview of the AB Micro820 PLC and it’s internal architecure. You can make use of the comments box to add information that you would normally give verbally.
You should also prepare an A4 poster which critically compares the AB Micro 820 to an alternative PLC of the same size range. Any alternative PLC can be chosen and you should evaluate the differences in performance, architecture, features etc. The poster should be included as an Appendix to the report.
Note: The customer representative is from a technical background, so you must ensure the communication is appropriate for the audience.
Marking Scheme
Task 1 – PLC Design Notes (20 Marks)
Design notes which should include as a minimum:
• a flowchart or Sequential Function Chart,
• I/O list,
• variable list,
• Electrical Connection Diagrams /20
Task 1 – PLC Program (10 Marks)
Structure of PLC program:
• Appropriate use of instruction blocks
• Clear logical structure
• Use of sensible/appropriate variable and alias names
• Clear and appropriate use of comments /10
Task 2 – Operators Manual and Further Documentation (20 Marks)
Operators manual explaining the architecture of a PLC (PowerPoint)
/10
Critical evaluation of the Micro 820 against a suitable alternative PLC (poster at the end of the report)
/10
Figure 1 – Input Devices
Figure 2 – Output Devices
Table 1 – Paint Booth I/O
Signal name PLC Input/output Description
System Ready Normally open push button
Extraction on Normally open push button
Stop Normally Closed push button
Emergency Stop Normally closed latched button
Parts in Position 1 Proximity Sensor
Parts in Position 2 Proximity Sensor
Red Indicator Light System Ready Light
Conveyor 1 24v contactor
Extraction Fans 24v contactor
Extraction On Blue 24v Indicator Light
Conveyor On Green 24v Indicator Light
Oven On Green 24v Indicator Light
8Oven Heating Elements 24v Contactor
Sample Solution
Compelling correspondence is essential to the achievement all things considered but since of the changing idea of the present working environments, successful correspondence turns out to be more troublesome, and because of the numerous impediments that will permit beneficiaries to acknowledge the plan of the sender It is restricted. Misguided judgments.In spite of the fact that correspondence inside the association is rarely completely open, numerous straightforward arrangements can be executed to advance the effect of these hindrances.
Concerning specific contextual analysis, two significant correspondence standards, correspondence channel determination and commotion are self-evident. This course presents the standards of correspondence, the act of general correspondence, and different speculations to all the more likely comprehend the correspondence exchanges experienced in regular daily existence. The standards and practices that you learn in this course give the premise to additionally learning and correspondence.
This course starts with an outline of the correspondence cycle, the method of reasoning and hypothesis. In resulting modules of the course, we will look at explicit use of relational connections in close to home and expert life. These incorporate relational correspondence, bunch correspondence and dynamic, authoritative correspondence in the work environment or relational correspondence. Rule of Business Communication In request to make correspondence viable, it is important to follow a few rules and standards. Seven of them are fundamental and applicable, and these are clear, finished, brief, obliging, right, thought to be, concrete. These standards are frequently called 7C for business correspondence. The subtleties of these correspondence standards are examined underneath: Politeness Principle: When conveying, we should build up a cordial relationship with every individual who sends data to us.
To be inviting and polite is indistinguishable, and politeness requires an insightful and amicable activity against others. Axioms are notable that gracious “pay of graciousness is the main thing to win everything”. Correspondence staff ought to consistently remember this. The accompanying standards may assist with improving courtesy:Preliminary considering correspondence with family All glad families have the mystery of progress. This achievement originates from a strong establishment of closeness and closeness. Indeed, through private correspondence these cozy family connections become all the more intently. Correspondence is the foundation of different affiliations, building solid partners of obedient devotion, improving family way of life, and assisting with accomplishing satisfaction (Gosche, p. 1). In any case, so as to keep up an amicable relationship, a few families experienced tumultuous encounters. Correspondence in the family is an intricate and alluring marvel. Correspondence between families isn’t restricted to single messages between families or verbal correspondence.
It is a unique cycle that oversees force, closeness and limits, cohesiveness and flexibility of route frameworks, and makes pictures, topics, stories, ceremonies, rules, jobs, making implications, making a feeling of family life An intelligent cycle that makes a model. This model has passed ages. Notwithstanding the view as a family and family automatic framework, one of the greatest exploration establishments in between family correspondence centers around a family correspondence model. Family correspondence model (FCP) hypothesis clarifies why families impart in their own specific manner dependent on one another ‘s psychological direction. Early FCP research established in media research is keen on how families handle broad communications data. Family correspondence was perceived as an exceptional scholastic exploration field by the National Communications Association in 1989. Family correspondence researchers were at first impacted by family research, social brain science, and relational hypothesis, before long built up the hypothesis and began research in a family framework zeroed in on a significant job. Until 2001, the primary issue of the Family Communication Research Journal, Family Communication Magazine, was given. Family correspondence is more than the field of correspondence analysts in the family. Examination on family correspondence is normally done by individuals in brain science, humanism, and family research, to give some examples models. However, as the popular family correspondence researcher Leslie Baxter stated, it is the focal point of this intelligent semantic creation measure making the grant of family correspondence special. In the field of in-home correspondence, correspondence is normally not founded on autonomous messages from one sender to one beneficiary, yet dependent on the dynamic interdependency of data shared among families It is conceptualized. The focal point of this methodology is on the shared trait of semantic development inside family frameworks. As such, producing doesn’t happen in vacuum, however it happens in a wide scope of ages and social exchange.
Standards are rules end up being followed when performing work to agree to a given objective. Hierarchical achievement relies significantly upon compelling correspondence. So as to successfully impart, it is important to follow a few standards and rules. Coming up next are rules to guarantee powerful correspondence: clearness: lucidity of data is a significant guideline of correspondence. For beneficiaries to know the message plainly, the messages ought to be sorted out in a basic language. To guarantee that beneficiaries can without much of a stretch comprehend the importance of the message, the sender needs to impart unmistakably and unhesitatingly so the beneficiary can plainly and unquestionably comprehend the data.>